Architectural Design & Engineering

A R C H I T E C T

Architectural Design Services

David Company is the one stop destination to build your dental or medical clinic from start to finish.

Why Us?

David Company and its consultants provide a wide variety of design build services for the development of ground up new construction projects, remodeling of existing spaces, and expansion of existing spaces to cosmetic upgrades.

The benefits

Our services are carefully crafted to deliver superior results based on your unique vision and values. With many years of experience designing medical and dental clinics, we understand the steps to take into consideration when starting design work. Meeting your budget and timeline is one of our essential goals in designing your dream practice.



We cover all the necessary steps to provide a workable design for the construction process.

  • Feasibility Studies prior to land purchases
  • Architectural design and documentation
  • Project budgets for design and construction
  • Obtain General building permit 
  • Discuss Financing options
Floor plan drawling from Architecture design and build firm

Frequently Asked Questions:

Can we get a 3-D rendering of the proposed building?

Yes we can provide a 3-D rendering of the entire building site and building so our clients have an amzing visual of what to expect.


What is the cost to build the proposed building?

The cost of the building has numerous components that determine the costs. We provide budgets up front for all our projects.

Can we build the building large enough to have other tenants to help pay the mortgage?

Yes. We provide consulting to the owner as to what size of building they would like to build to meet their needs. It usually comes down to financing options that drive the type and size of building.

How long will it take to complete the permit set of drawings for a new building? 

There are many components that are compiled to produce a permit set of drawings.  Timelines will vary with different city jurisdictions and building dept. and scope of work required.

Permits to build out for new construction and remodels in an existing building will usually take anywhere from 3-6 weeks depending on the cities building dept. We then continue to work on the construction set of drawings while waiting for building permit approval. Cosmetic upgrades to existing space will usually not need a building permit.


How long does it usually take for the completion of construction after the permit has been issued?

The duration and timeline for the actual construction process will depend on the complexity and the scope of work. We always provide a construction schedule to all our clients so they can anticipate and plan their grand openings.

Book a consultation today!

Have a question? We’re here to help. Send us a message and we’ll be in touch.

Book a Consultation

Share by: